Access for refinery structures where
delay is Not an Option.

MCWP access for shutdown, inspection and maintenance work in live refinery sites.

Flare tip access for critical
shutdown work.

For flare tip replacement and transfer of crew, tools and material at height. 

Column access for insulation and
rescue planning.

For insulation change, rescue access and transfer of crew/materials on tall process columns. 

Chimney access for platform
and coating work.

For painting, platform removal, strengthening and access at multiple chimney elevations. 

Tank shell access for
maintenance work.

For insulation change, sprinkler line work, painting and sandblasting on storage tanks.  

Flarestack

Process Columns

Chimneys

Tank Farms

What Changes when MCWP is on Site

THE CHALLENGE

MCWP RESPONSE

SITE BENEFITS

Extreme Heights

Refinery columns and flare stacks demand stable access beyond 100m

300+ meter Access

Rack-and-pinion movement for high refinery structures without scaffold build-up.

300m+

Working Height Capability

Congested Refinery Layout

Pipe racks, process lines, and live equipment restrict usable ground area.

Compact Base Setup

Special chassis and mast positioning reduce obstruction around live plant zones.

Compact

Ground Footprint

Shutdown Pressure

Every hour of delay affects turnaround schedule and contractor productivity.

Faster Setup than Scaffold

Modular mast erection reduces long scaffold erection and dismantling cycles.

Faster

Mobilisation

Permit & Safety Control

Work-at-height activity requires guarded access, documented methods, and controlled operation.

Fail-Safe Access System

Guarded platform, electric drive, emergency lowering, and rescue-ready access.

Engineered

Fail-Safe System

Oil & Gas Access Workscope

FLARE TIP & STACK WORK

PROCESS COLUMN

COLUMN REPAIR & INSULATION

CONCRETE CHIMNEY

CHIMNEY MAINTENANCE

CRUDE TANK FARM

TANK SHELL COATING

Splitter Coloumn Progressive Access

125m Working Height

SC8000

Snake Platform

Full-Height Column Access

Why refineries Call Us Back

Refinery-Floor Discipline

Crews who understand permit zones, hot-work controls, and live-plant access culture.

Shutdown-Window Planning

Erection, working sequence, and dismantling planned around your turnaround calendar.

OEM-Backed System

Scanclimber platform quality, structural ties, and configuration guidance through an authorised channel.

Indian Refinery Experience

Repeated deployment across columns, flares, chimneys, and tank farms — the structures refineries maintain most often.

Explore  MCWP for Refinery Access

See how mast climbing platforms work, how they compare with scaffolding, and what to check before selecting access for refinery structures. 

FAQ

Why are major Indian refineries using MCWP for shutdown work?

MCWP helps shorten access preparation time and brings technical teams safely to height. It is already used on shutdown and maintenance work across IOCL, HPCL, BPCL, Reliance, and other major refinery sites.

Yes. The platform travels to the required height, allowing inspectors, supervisors, and client engineers to review work from a guarded deck near the actual repair or inspection point — instead of relying only on photos or distant scaffold access.

Sometimes MCWP, sometimes scaffold, sometimes a hybrid of both. We propose what fits your structure, shutdown window, and work scope — not only what fits our equipment fleet.

Share the structure type, height, shutdown window, tie-point conditions, site constraints, and crew/material loads. That is enough for us to come back with a first configuration proposal.

Build with Confidence. Build with Eclimber.

Engineering Reliable Access Solutions Since 2004

Popup Form