One platform across the entire.
Facade.

Men, tools, and material move together on one stable working face — reducing crane dependency and fragmented access.

Full-height glass, cladding, and finishing work
on commercial and residential towers.

Crew, tools and façade materials travel together on one stable working platform. 

Platform layouts for curved, inclined, and projecting
façades that scaffold struggles to follow.

Configurable platform geometry maintains practical access around changing façade profiles. 

Access for airports, convention centres, and
landmark buildings where finish standards are critical.

A wide working platform supports coordinated manpowertools and façade-material handling. 

Façade maintenance and glass replacement on
occupied buildings with minimal disruption.

Planned external access reduces ground obstruction around active building areas. 

Tower Façades

Complex Façades

Signature Projects

Live Buildings

What Changes when MCWP is on Site

THE CHALLENGE

MCWP RESPONSE

SITE BENEFITS

Heavy Façade Panels & Materials

Glass panels, tools and installation crews require coordinated movement at height.

High-Capacity Working Platform

Crew, tools and façade materials travel together on one guarded platform.

Coordinated

Panel Handling Row 2

Curved & Projecting Façades

Setbacks, curves, corners and projections make conventional access difficult to reposition.

Configurable Platform Geometry

Platform length, extensions and working distance are configured around changing façade profiles.

Adapted

Façade AccessRow 3

Occupied Building Work

Glass replacement and façade repair must be planned around occupants and active ground-level movement.

Controlled External Workfront

The working platform remains outside the building with access and ground activity planned around the work zone.

Reduced

Ground DisruptionRow 4

Fragmented Access Methods

Multiple access systems increase coordination between manpower, tools and material movement.

One Integrated Platform

Crew, tools and façade materials move together through one primary working platform.

Simplified

Site Coordination

Façade Access Workscope

TOWER FAÇADES

High-Rise Buildings

Silos

Reactors

Vessels

COMPLEX FAÇADES

Complex Façades

Silos

Reactors

Vessels

SIGNATURE PROJECTS

Signature Projects

Tanks

Spheres

Furnaces

LIVE BUILDINGS

Live Buildings

Flare Stacks

Bridges

Pipe Racks

Case Study

Bharat Mandapam Curved Façade Glazing with an 18 m Access First Anchor

Scaffolding, boom lifts and scissor lifts were assessed for the façade-glazing work, but the curved, outward-leaning profile and access blockage made glass handling at height difficult. A specially configured MCWP created a clear working face for the crew, tools and glass panels as the façade profile changed with elevation. 

Wheel-Chassis MCWP

18 m First Anchor

Profile-Based Extension Platform

Why Façade Teams Involve Eclimber Early

Façade-Sensitive Planning

Work sequence, platform clearance and movement are planned to help protect glass, cladding and completed façade surfaces.

Geometry-First Configuration

Platform layout is developed around curves, corners, setbacks and projections before mobilisation.

Panel-Handling Readiness

Platform configuration, lifting arrangements and material-handling requirements are reviewed against panel size and weight before mobilisation.

Live-Building Coordination

Tenant access, ground movement, exclusion zones and work timing are considered before deployment.

Share the façade profile, panel details and site constraints early. The access configuration can then be developed before mobilisation and installation work begins 

More About MCWP in Facade Access

Explore the MCWP System Behind Complex Façade Access

Façade work rarely follows one straight, uninterrupted elevation. The MCWP system can be configured with different platform geometries, lifting and handling accessories, protection arrangements and chassis options so the access setup can respond to the façade profile, panel movement and working sequence. 

FAQ

Why are façade contractors using MCWP for tall buildings and refurbishment work?

MCWP gives a stable working platform for façade installation, replacement, and repair — with faster erection than full scaffold and less obstruction around the building.

Platform-to-façade clearance is planned during configuration. Deck width, tie position, and working distance are selected so crews can work close to the façade while keeping finished surfaces protected.

Yes. The mast is tied to the building at planned intervals, giving a stable working platform for high-rise façade work. Wind exposure, platform width, and site conditions are reviewed during access planning.

Share building height, façade length and profile, panel sizes and weights, occupancy status, ground constraints, and any areas with balconies, projections, or inclined surfaces.

Build with Confidence. Build with Eclimber.

Engineering Reliable Access Solutions Since 2004

Popup Form